From: route@monster.com
Sent: Saturday, April 16, 2016 2:04 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
Thomas MacIndoe
PROFESSIONAL SUMMARY ·
Working as an
accomplished Telecommunications Engineer with more than 30 years experience
in the industry, both supervising personnel and as a technician,
troubleshooting, repair, testing and cabling Telecommunications equipment. ·
Proficient in
Key and PBX Systems (NEC, Nortel), Technician of transport facilities (DS1
through OC192), installation and repair of various DACS (Tellabs and
Alcatel), Multiplexes and Fiber equipment. Also proficient in RF Wireless
Industry, dealing with product lines from Lucent, Motorola and Nokia and
Ericson. ·
Maintaining
30 Cell Sites (Field Technician Engineer II) for NEXTEL doing BR Adds
(Radios), Site Upgrades (DXU and CSU’s), quarterly preventive maintenance and
audits on new installations as well as other Technician troubleshooting. EXPERIENCE WITH THE
FOLOOWING CIRCUITS AND EQUIPMENT: ·
Four wire
circuits. ·
Tie lines. ·
Direct inward
dial lines. ·
Centrex
lines. ·
Watts lines. ·
Central
office lines. ·
Tandem lines. ·
Ground start
DS0 Lines ·
FXO lines ·
Loop start
lines ·
Manual ring
down lines ·
Integrated
service digital network. ·
DSO through
oc-192 transport technician. ·
T1 lines. ·
Multiplexers. ·
D-4 channel
bank ADC, kentrox). ·
Alcatel 3x50
Rockwell mux’s. ·
Alcatel 1630
and 1631 DACS. ·
Tellabs 5500
titan and 532l DACS ·
T-BERD
Certified ·
JDSU
Certified ·
BTS Site
Master Certified ·
PIM-PRO
Certified ·
Kaulas
Certified ·
Antrisu
Certified ·
Kick meter to
test out copper leaving Central Office to find failure point TECHNICAL EXPERIENCE Software/Databases:
MS
Office, MS Word, MS Excel, MS Power Point, MS Access, MS Outlook, Visio Cad
Drawings, SharePoint Operating
Systems: MS
Windows Hardware
& Networking:DS1,
4G LTE, JDSU,PIM-PRO, KALAUS, BOMs, Visio Cad Drawings, Sprint, Ericsson, 3G,
4G, LTE, GSM, Nortel 2G, 3G, Ericsson, RAN, G1, G2, G3, Switch, NEXTEL, QA,
T1’s, HSMO, SINEAD, VSWR, Switch, Remedy Ticket Siterra database, Nortel,
Ericsson, Sprint MMBS, Lucent Platforms RBS, Scoping engineer Power
plants-Lorain, Galaxy Lucent Battery Back up cabinets. Others:ALPHA, BETA, GAMMA PROFESSIONAL EXPERIENCE JSW Telecommunicationd group.Michigan Ohio
Indiana
SEPT-2014 TO MARCH, 2015 Complete all aspects of the SOW to meet the
customer needs or where irregularities Along with the trenching,( according
to the customer Or OSHA standards. Land Equipment in designated area. Secure
the can accordace with cabibinet or BTS cabinet, Wire up cabinet as per SOW and land and
terminate all power connections, DEPENDING complete wiring in cabinet alarm system for
NOC and NMC’S Test named. turn up T’1s depending if they
have been provisioned correctly. Verify cell site RADIO ALL
SECTORS to ensure all radios and control channels are Operating in spec/s. Drive test all sectors on a site to ensure
everything is working correctly. CERTIFICAIONS Include BTS SITE MASTER,
ANRITU JDSU, KALUAS, PIM PRO. T-BERDS ALL MODELS Worked as a contractor FOR Sprint
where I where I became very heavily involrd in deploying ans sight line up
for proposed for Microve links established all over the upper New
York down thru Pennselvanis Bluestream Professional Services/AT&T Wireless,
Michigan, IBTS cabinet toindiana, IL, WI Apr 2014 – SEPT 2014 Field Engineer/
Equipment Engine ·
Responsible
for installation of 4G LTE for AT@T in multiple markets ranging from new
build of 4G LTE in multiple states. ·
Responsible
for site safety and ensure that the general contractors follow all safety
policies including inspection of gears, tools, safety kits work trucks and
safety hazards. ·
Responsible
for ALL site walks in Michigan markets as well as red line CD’S, BOM issues,
as all pertinent documentation for site builds, i.e. RFDS, structural
drawings, P.O.s, NTP and all required permits. Creation of the SOW. ·
Responsible
for all close out packages as well as 24v hr. documents. ·
Responsible
for all uploads to SIIM, SharePoint and AT@T Siterra databases. ·
Responsible
for all true ups for all CM” S in all markets. ·
Responsible
for all required photo documentation associated with said packages. ·
Responsible
for all site walks after builds to ensure all phases of project have been
adhered to as per customer standards to minimize potential punch list items. ·
Responsible for
writing all NTE’s for equipment related to CAS tickets as well as tiger team
material needs. ·
Currently
running 10 Responsible for coordination of all crew movements in the markets
to effectively address sites logistically. Crews for each phase of project
for a total of 30 crews at one time. ·
Responsible
for all material purchases outside of the BOM materials. ·
Re-certified
in BTS Site Master, JDSU,PIM-PRO and KALAUS test equipment. Technologies: 4G
LTE, SharePoint, JDSU,PIM-PRO, KALAUS Transnet Communication Group March 2014 – Apr 2014 Project Manager ·
Bid pricing
for all installations, materials. ·
Wrote SOW and
BOMs for all projects as well as true up after completion. ·
Coordinated
all efforts with all city municipalities for cut over to new communications
platforms. ·
Site survey
all microwave installations throughout Michigan for police commutations. Technologies: BOMs AWT911 Jan
2014 – March 2014 Project Manager/
Equipment Engineer ·
Manage the
installation of all 911 call routing Centers throughout the state of Michigan
and Ohio. ·
Survey
customer Operations Centers that handle both LMS-1000 Platforms to Patriot
and Ceridian 911 Call Center Platforms. ·
Order all
materials for site build out and cabling diagrams via Visio Cad drawings. ·
Instruct and
troubleshoot with 32 Technicians on the proper install ion procedures. ·
Over see
training on all 911 systems supported by AWT911. Technologies: Visio
Cad Drawings General Dynamics Jan 2013 – Dec 2014 Equipment Engineer
/Construction Manager ·
Responsibilities
include insuring all new sites build and modifications are done in accordance
with OSHA Standards as well as Industry Standards for Sprint, Ericsson, Nokia
and Samsung Product lines. Construction Managers AND General Contractors Also
responsible for the quality and standards of the Scope of work (SOW). ·
Responsible
for developing a test center to integrate Samsung 3G and 4G LTE for
Ericsson/Sprint/Samsung joint venture for deployment of both technologies.
Site Survey sites for power requirements for LTE and the installation of
hybrid cable, (power and fiber) from RRU’s to Antenna connectivity. PIM test
cables as well as overall build out of new BTS platforms. ·
Responsible
for ETTCS project, (Fiber) right of way into compound. ·
Determine how
many vaults needed to route from roadway and determine termination points. Technologies:
Sprint, Ericsson, 3G, 4G, LTE Goodman Networks – AT@T Mobility Turf Vendors Main
MarketApr
2012 – Jan 2013 Scoping Engineer ·
Scoping
Engineer for LTE, UMTS and ETTCS, Carrier growth work closely with Site
Acquisition Manager, Project Manager and RF to establish a BOM and OOM for
site build out requirements. Work closely with ATT techs to troubleshooting
Equipment platforms. ·
Ericsson 3G
UMTS, Alacatel lucent LTE, Nortel BTS and Nokia GSM. Configuration of build
out from New Site Builds to growing existing platforms. Scope sites for
materials and recourses to accomplish task. Technologies: LTE,
GSM, 3G, BOM Employment Gap: Time off for Medical Reasons Feb 2010 – Apr 2012 T-Mobile Jan
2005 – Jan 2010 Field Engineer ·
Maintained
Nortel 2G Platform and 3G Ericsson Platforms. ·
Integrated
Nokia 2G platform with Ericsson 3G platform throughout New York City. ·
Installed and
incorporated LMU’S for E-911 calling. Troubleshoot units as well. ·
Installed T1s
from D-MARC to PRIPRO interface equipment as well as various interfaces. ·
Certified in
both Anristu and BTS Master equipment. ·
Replaced
repaired and installed RF jumpers to meet requirements. ·
Experienced
in RAN technology pertaining to t-Mobile. Technologies:
Nortel 2G, 3G, Ericsson, RAN Tangent Field Engineer ·
Scope of work
consists of commissioning integration of ultra-site and edge, cell site
upgrades to both indoor and outdoor 850/ 1900 NOKIA product line. ·
Perform
simple and complex ads. ·
Cabinet swaps
of Nuss Cabinets to 24V Cabinets. Lucent Sep
2004 – Oct 2004 ·
Trained and
certified in Lucent Flex net Legacy’s G1, G2, G3 and 4.0 Mod Cells both
indoor and outdoor units as well as Compact Units in the Verizon Markets. ·
Trained in
Lucent, ADVO and (PSC Band Data Applications). ·
Worked with
both 850/1900 PSC Bands on both installation and troubleshooting from Switch
Side and Cell Side. Technologies: G1,
G2, G3, Switch Nextel Dec
2003 – Sep 2004 Field Technician ·
Maintaining
30 Cell Sites (Field Technician Engineer II) for NEXTEL doing BR Adds
(Radios), Site Upgrades (DXU and CSU’s), quarterly preventive maintenance and
audits on new installations as well as other Technician troubleshooting. ·
Worked with
Spectrum Analyzer to insure noise floor and correct frequency operating
ranges –TX and RX. Maintained 30 Cell Sites in the Brooklyn/ Queens area. ·
Worked with
Site Master and Iden Tools with M-Field works, which is a type of QA and
auditing function. Tested T1’s and troubleshot Cell Site outages. Technologies:
NEXTEL, QA, T1’s Artech Jun
2003 – Dec 2003 Field Technician ·
Installation/Technician
of NOKIA 850/1900 Cell Sites. Responsibilities included: Respond to Analog,
Digital and Microwave trouble reports, Troubleshoot T1’s, Troubleshoot from
output of MTX (Mobile Telephone Exchange) to the antenna. ·
Isolate fault
to the replaceable part, Troubleshoot Microwave Radios and Pas
Multicouplers-RMC’s- Duplexer-Antenna System-ICRM, Daily access remedy ticket
program, Access and interpret diagnostics for Cell Site and Switch, Isolate
trouble to either Cell or Switch. ·
Respond to
alarms, Manage growth and changes of the network through change and work
orders, Provide new data for Cell Site Database, Identify and ensure
availability of equipment need to implement change order, Ensure viability of
change order package. ·
Implement
change of work order in Cell and Switch, Perform Drive Test, Maintain the
system through standardized preventive maintenance procedures, Verify FCC
specifications are met, Perform power plant maintenance, Verify alarms
(operational and environmental), Verify Cell sanity. ·
Perform
preventive maintenance, Ensure all regulatory Specs are followed, Monitor
Cell activities, Retune Cell Sites with manual tuners, Cell Site audit, Run
power tests on Power Amps, Sweep antennas, RMC’s and duplexer, Run tests
(HSMO, SINEAD, VSWR), physically inspect antennas system. ·
Check local
receiver module, Test T1’s, Test Microwave Link, Perform Air Conditioning and
Refrigeration maintenance, Perform alignment procedures, set radio, audio and
modulation levels, Conduct frequency accuracy measurements, Worked as RF
Engineer designing coverage areas on 3 sector Cell Sites, (ALPHA, BETA and
GAMMA), as well as Microwave Shots. ·
Design ASMIUTHS
Tilts and Frequency allocations for Data fill of Cell Sites, Conduct
acceptance tests, Perform drive tests, Perform building and facility
maintenance, Assist with optimization, Verify channel allocation is correct. ·
Verify
hand-off parameters are operating correctly, Conduct new Installation
turn-up, Install new Cell Sites, Install equipment at staging area,
physically connect at Site, Test Grounds before tune-up. Technologies: HSMO,
SINEAD, VSWR, ALPHA, BETA, GAMMA, Switch, Remedy Ticket GPS Antennas for Drive Test, Parsippany, NJ Jun 2003 – Sep 2003 T-Mobile ·
Applications
for turn-up of new Cell Sites. ·
Installed two
Symetricom code to the Telecommunications Industry Telecordia CLLI Code
Standard. This reconciliation occurs in the LNS Legacy inventory systems. ADC Communications Mar 2003 – Jun 2003 Field Technician ·
Turn-up and
test T1’s in Verizon C.O.’s for the 3190 Wideband Equipment and remove older
versions of the same equipment. Test down to DS-O level for Voice and Data
applications. AT&T Local Network ServicesOct 2001 – Mar 2003 Field Technician ·
Analysis and
reconciliation of DAMMD extract records for the purpose of reconciling the
embedded LNS CLLI.Contractor Tellabs
Oct 2000 – Oct 2001 Field Technician ·
Responsible
for Site surveys and expansion of existing platforms. ·
Involved in
monitoring and maintenance of T1 lines. ·
Supervised
multiple vendors involved in installation projects. ·
Maintained
progress reports and material shortages as to impact job completion due
dates. Lucent 5ESS Wireless Switch Oct 1999 – Sep 2001 AT&T Wireless
Operations Switch Manager (OPS). ·
Respond to
Analog, Digital and Microwave trouble reports. ·
Troubleshoot
T1’s from LEC to BTS and from BTS back to MSC. ·
Troubleshoot
from output of MTX (Mobile Telephone Exchange) to the antenna. ·
Isolate
trouble toward either the Cell or the Switch. ·
Manage growth
and changes of the network through change and work orders. ·
Provide new
Data for Cell Site Database. ·
Identify and
ensure availability of equipment needed to implement change order. ·
Ensure
availability of change order package. ·
Implement
change of work order in Cell and Switch. ·
Perform Drive
Test for RF coverage, service performance measurements and co-channel
interference. ·
Conduct new
installations turn-up. ·
Install new
Cell Sites. ·
Install
equipment at staging area. ·
physically
connect at Site. ·
Test grounds
before turn-up. ·
Run limited
test on Cell Site. ·
Map
geographical service area with signal strength indicator. ·
Conduct
acceptance tests. ·
Perform Drive
tests. Alcatel Jun
1999 – Oct 1999 Site Technician ·
Responsible
for the timely installation of various product lines (1630 and 1631) DACS
Systems for multiple LEC and CLEC customers in accordance with Bell Core
standards (Telecordia). ·
Responsible
for Site Surveys and expansion of existing platforms. ·
Involved in
monitoring and maintenance of T1 lines. ·
supervised
multiple vendors involved in installation projects. ·
Maintained
progress reports and material shortages as to impact job completion due
dates. ·
Included in
duties were writing the job spec’s package as well as floor plan lay outs. ·
Develop
cabling infrastructure for all Transmission and Switch wiring configurations
in accordance with Bell Core Standards, including category 3, 5 and 7 cable,
coax cable and fiber optic cable. ·
Test and
terminate all types of cabling. ·
Installed
Rockwell 3X50 MUXS in transport, Switch and collocate locations that required
troubleshooting and connectivity for NMS monitoring. EDUCATION Naval Electrical
and Electronics Iona College, New
Rochelle NY Baseball Scholarship Training: 400 HZ
Motor Generator School Jobs Electric
School Alarm Propulsion
School Western Electric
and AT&T Dimension 200 Schools Mark 19 Gyrocompass
School CERTIFICATIONS PBX CERTIFICATIONS: AT&T DIMENSION
2000 NEC SIM NEC IMG NEC 2000 NEC 1400 NORTEL MERIDIAN KEY SYSTEMS
CERTIFICATIONS: Northern Telecom
Norstar TIE BX TIE BK TIE VDS TIE ONYX EAGLE AT&T MERLIN VOICE MAIL SYSTEMS: Octel centigram Replay plus Octel overture 350 V-band voice mail U.S. Navy (AOR) Savannah Work center leading
Petty Officer-responsibilities for operations and maintenance of the ship’s
communications and electronic equipment as IC Shop LPO Troubleshoot,
repair and test shipboard phone system, IC external equipment circuits,
operated IC and ACO switchboard Troubleshoot and
repair SYNCHRO Systems, replace and adjust alarm sensing devices, maintain
technical and maintenance manuals Supervised eight personnel |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Advanced |
|
|
|